- Ashford Rd
- Maidstone
- ME17 1XG
Phase 2 Ready to occupy
Brand new
light industrial & logistics units
25,811 to 36,686 sq ft
Strategically
located on
J8 of the M20
Grade-A
light industrial & logistics buildings
Established
park location
Phase 2
available now
Kent’s established business location
Building on the success of the established LOC8 park, Phase 2 offers brand-new light industrial and logistics units ranging of
25,811, 31,413 and 36,686 sq ft.
With 50% already pre-let, Phase 2 is moving fast. All buildings offer a flexible and energy-efficient operational environment, with BREEAM ‘Excellent’ and EPC ‘A+’ ratings.
Occupiers at Loc8 include:
Logistics & light industrial spaces
Grade-A Specification
Minimum 9m internal eaves
Level access doors
50 kN/m2 floor loading
10 to 15% roof lights
25 to 50m service yards
Secure yards
Cycle parking and shelters
Curved roof
Timber cladding
Profiled aluminium cladding
Quality cat A office fit out
Raised access flooring
Suspended ceilings
Fitted kitchen and toilets
VRF heating and comfort cooling
Sustainable Spaces
Highly insulated with reduced air permeability
Solar PV installed
LED lighting with PIR sensors
Extensive green landscaping
Protected nature areas
High efficiency office heating and cooling
Water saving sanitary ware
Dedicated LOC8 electric bus service
20% electric vehicle charging points
Breakout spaces
Regional & international connections
With direct access to J8 M20, LOC8 is well situated to serve local, regional and international markets.
HGV DRIVE TIMES
Road | miles | hrs/mins |
Ashford | 16 | 20 |
M25 J3 | 23 | 25 |
M25 / M26 Junction | 23.3 | 27 |
Dartford crossings | 27 | 32 |
Canterbury | 30 | 35 |
Central London | 47 | 1hr 26 |
Sea | miles | hrs/mins |
Dover | 37 | 39 |
Tilbury | 38 | 49 |
London Gateway | 40 | 52 |
Air | miles | hrs/mins |
London City | 41 | 59 |
London Gatwick | 45 | 49 |
London Stansted | 64 | 1hr 12 |
London Heathrow | 69 | 1hr 18 |
Rail | miles | hrs/mins |
Hollingbourne | 41 | 59 |
Bearsted | 45 | 49 |
Maidstone East | 64 | 1hr 12 |
Euro Tunnel | 69 | 1hr 18 |
HGV Drive times & population
mins | people |
90 | 8,216,762 |
180 | 20,725,691 |
270 | 33,798,166 |